Requirements in.Traceable firmware out.

From DOORS requirements to verified firmware

The playbook in one paragraph

A new feature arrives as a set of requirements. Ana designs the change, writes the firmware, runs it through unit, SIL and HIL tests, and keeps a trace from every requirement to the code and test that satisfy it.

When to run it

A requirements baseline in DOORS, Polarion or Jama for a feature on a regulated or safety-relevant device, with traceability required for release.

Works with

  • Requirements: DOORS, Polarion or Jama
  • C, C++ or Rust toolchains
  • RTOS (FreeRTOS, Zephyr, QNX and others)
  • SIL/HIL rigs and CI

What Ana needs from you

  • Requirements baseline
  • Target hardware and RTOS
  • Coding standard (for example MISRA C) and safety class

How Ana runs it

Step by step.

5 steps from trigger to done - each one visible to your team as it happens.

  1. 01

    Analyze requirements

    Ana reads the requirements, flags ambiguity and conflicts back to the author, and derives testable acceptance criteria for each one.

  2. 02

    Design the change

    Ana proposes the module design, task and interrupt changes, and memory and timing budgets for engineering review.

  3. 03

    Implement to standard

    Ana writes the firmware against your coding standard and runs static analysis, fixing violations before review.

  4. 04

    Verify on SIL and HIL

    Ana writes unit tests, runs software-in-the-loop, then hardware-in-the-loop on your rigs, and investigates failures with logs and traces.

  5. 05

    Close the trace

    Every requirement links to its design element, code and passing test, ready for the design history file.

What you get

Deliverables

  • 01Firmware changes with static-analysis clean results
  • 02Unit, SIL and HIL test results
  • 03Requirement-to-code-to-test trace matrix
  • 04Review-ready change package

What usually goes wrong

And how Ana handles it.

Risk

Ambiguous requirements implemented literally

Ana raises ambiguity before writing code and records the clarification against the requirement.

Risk

Timing and memory regressions

Budgets are measured on target, not assumed, and reported in the change package.

FAQ

Common questions.

Yes, through your HIL rigs and CI agents connected to them.

See it in your stack

Run this playbook on your systems.

Thirty minutes, your repositories and cloud, one real instance of this job.