OPENANA FOR MEDTECH

Move MedTech NPD Forward Without Losing Traceability

OpenAna connects requirements, software, firmware, cybersecurity, verification, validation, and documentation so MedTech teams can create reviewable engineering outputs and evidence earlier-with Quality, Regulatory, and technical experts in control.

Requirements-to-Evidence Digital Thread

Select a requirement, then a stage, to see its evidence record

ILLUSTRATIVE - EXAMPLE DATA

Requirements

REQ-118: Alarm response time < 2s

Evidence & release impact

Select a stage in the trace to see its owner, revision, reviewer, and release impact.

Reviewed by: V&V Lead and Quality retain approval on every evidence record - this thread accelerates assembly, not sign-off.

Engineering-Led, Not Clinical DecisioningHuman-Reviewed EvidenceDesign-History-File Aware
VP EngineeringR&DQualityRegulatoryProduct

The problem

Handoffs and evidence stall MedTech NPD

01

Disconnected requirements

Requirements, software, and firmware live in separate systems with no shared traceability.

02

Late-stage cybersecurity

Threat modeling and SBOM review happen too late to influence architecture.

03

Manual traceability

Requirements-to-test matrices are assembled by hand, late, and inconsistently.

04

Evidence assembled at the end

Design-history-file evidence is built under deadline pressure instead of continuously.

High-value use cases

High-value use cases

Requirements decomposition

Ambiguity review across product and design requirements.

Software/firmware acceleration

Architecture and implementation acceleration.

Cybersecurity evidence

Threat modeling, SBOM/SCA, and remediation evidence.

Requirements-to-test generation

Traceability matrix preparation from requirements to tests.

V&V planning

Regression coverage and evidence readiness.

Documentation support

Design-history-file support and drafting.

Post-market workflows

Connected-device telemetry and monitoring workflows.

What OpenAna delivers

What you receive

Reviewable requirements and acceptance criteria
Architecture and interface artifacts
Code/firmware changes through pull requests where applicable
Threat models, SBOM findings, remediation recommendations, and evidence
Test cases, verification matrices, coverage and gap analysis
Traceability links and documentation drafts
Release-readiness view with unresolved gaps and owners

Governed by design

Built for Controlled Product Engineering

OpenAna assists engineering work; it does not make clinical, safety, quality, or regulatory decisions. Authorized engineers and SMEs review outputs.

Source lineage and version history on every artifact
Approval gates before draft becomes approved record
Clear boundary between draft artifacts and approved records
Supports workflows aligned with applicable standards - not a compliance claim

A focused first engagement

NPD Evidence Accelerator

Choose one product/module and one bottleneck-requirements-to-test, cybersecurity evidence, firmware-to-validation, or documentation traceability. Establish the baseline; connect a bounded artifact set; generate draft outputs; validate with the responsible SMEs.

01

One product/module

A single named product or software module - not the full portfolio.

02

One bottleneck workflow

The single workflow (traceability, cybersecurity evidence, or documentation) causing the most delay.

03

Bounded artifact set

A defined set of requirements, code, and test artifacts to connect for the pilot.

04

Named SME reviewers

The subject-matter experts who will validate draft outputs before they become approved records.

Success metrics

Time saved · Coverage improvement · Defect/gap findings · Unresolved risks

Frequently asked

Questions we hear most

Does OpenAna make regulatory decisions?

No. OpenAna assists engineering work; authorized engineers and SMEs make all clinical, safety, quality, and regulatory decisions.

Can we start with one module?

Yes - the recommended first engagement is one product/module and one bottleneck workflow.

What about IEC 62304 or ISO 13485 claims?

We use "supports workflows aligned with..." language and identify the exact artifact/process supported, rather than claiming compliance.

Ready when you are

Assess one NPD workflow with OpenAna.

Assess One NPD Workflow